Home
 
General Information
  Contact
  Commissioners
  Directions
  Drinking Water
  History
   Events
  Employment
  Useful Links
 
Photos
Projects & Construction
  Current Projects
  Future Projects
Policies
  Developer
  Rates and Fees
Affiliates
 

West Virginia Rural Water Association

 
Miss Utility of West Virginia
 

Follow PutnamPSD on Twitter 

To view any pdf documents on this web site, you must have Adobe Acrobat Reader installed on your computer. You can download it for free clicking on the Adobe Acrobat Reader icon:

 

 

Putnam Public Service District

Policies and Standards

 

The following documents provide information regarding the policies and standards of the Putnam PSD (all documents are in .pdf format):
 
Water Service :
Water Ordinance -- Codifies our requirements for materials and methods for all construction on and connections to the PPSD water system.
Alternate Water Extension Plan Agreement (.pdf) -- This form must be completed and approved by the District for developers looking to extend a water main into an area not currently served by PPSD.

Water Standard Details -- Provides detailed drawings of standard equipment and procedures for water taps and construction projects.

Cross-Connection Control Work Ordinance -- Codifies our requirements regarding cross-connections in order to prevent backflow into our water system.
Sewer Service :
Sewer Ordinance -- Codifies our requirements for materials and methods for all construction on and connections to the PPSD sewer system and discusses the mandatory use of public sewer facilities in the PPSD sewer service area.
Alternate Sewer Extension Plan Agreement (.pdf) -- This form must be completed and approved by the District for developers looking to extend a sewer main into an area not currently served by PPSD.

Sewer Standard Details1 -- Provides detailed drawings of standard equipment and procedures for locating wire, service lines, concrete pipe anchors, valve markers, gate valves, concrete backing, trenching and bedding, cleanout assembly, sewer laterals in deep trenches, casing pipe, force main cleanouts, and transitioning from DI to PE pipe when working on our sewer system.

Sewer Standard Details 2 -- Provides detailed drawings of standard equipment and procedures for grinder pumps, manholes, and grease traps.

Pump Station Standard Details 1 -- Provides detailed drawings of standard equipment and procedures for pump station control panels and control panel shelters.
Pump Station Standard Details 2 -- Provides detailed cross-sections of our standard pump station layout along with diagrams on air release, assemblies, gauge assemblies, and our typical pump station layout and instructions on fencing and securing the station site.
Pump Station Standard Details 3 -- Provides details and specifications for antennas, meter wells, stilling wells, switches, generator plugs, pvc conduit transitions, electric service polls, and junction boxes.
Grinder Conduit Layout -- Codifies our requirements for the layout of grinder conduits.
E One Layout -- Codifies our requirements regarding E One grinder pumps.
General Policies :
Leak Adjustment Policy -- Describes PPSD's policy regarding billing adjustments in the event that a line failure occurs between our water meter and a customers residence or place of business. If you feel that a leak adjustment is needed, please fill out this form. If the leak was the result of a problem with a swimming pool, please use this form.
Return Payment Policy -- Describes PPSD's policy regarding payments returned to the District for insufficient funds.
Freedom of Information Act Policy -- Describes PPSD's policy regarding FOIA requests received by the District.

Copyright 2007-2012 Putnam Public Service District. All Rights Reserved.